French flag

TIC PF

Laydown Concrete Skip with TI mechanism

Laydown skip with incorporated bale arm in the body of the skip to improve safety on building sites.

Type of mechanism: TI mechanism (European patent). Very enclosing funnel to get back cement grout leakage when pouring concrete. Removable funnel without any tool for easy cleaning.The gate is made of abrasive high resistance steel to improve its lifetime.

Lifting device: Fixed bale arm. Handling with 2 chain slings fitted on the lateral eyes of the skip (chain slings not provided with the skip).

Advantages: Traditional moving bale arm removed to prevent pinching and crushing risks. It also reduces the weight of the skip.

Discharge mode: Central

Gate control: Lever

Sizes available: 2000lt, 1500lt, 1000lt, 750lt, 500lt.

From 1000L capacities, skips are fitted with the gate auxiliary control option to ease the gate closing.


Comparison with traditional systems:

CharacteristicsTraditional SystemsGeoplast Reusable Formwork
Hindrance-Modular system
Waterproof10%100%
ResistanceLimitedUp to 60 kN/m2
Concrete adherenceRequires dismantling agentsBeing made of plastics, GEOTUB PANEL does not stick to concrete
Protection10%The best protection for the columns until the end of the operations
PlumbingRequires long operations and it is often inaccurateQuick and accurate thanks to the external structure that allows easy shoring and plumbing
Dismantling agentsRequiredNot required. Everitt Site Supplies recommend 'Kleen Kote' protection and release formula to maintain your forms in top condition.