Building a concrete column around an existing steel pillar

Countdown Distribution Centre
Constructed by:
Hayden and Rollett Construction
Products used:

Geotub 600mm Round

Building a concrete column around an existing steel pillar at the Countdown Distribution Centre in Favona Road, Manukau, Auckland.

An excellent result was achieved for the client ... made possible only by using this type of formwork.
Enquire about this product