Everitts - Right 2 Site
Home
Phone Everitts now Phone
Email E-mail
Menu
 
GEOPLAST Concrete Formwork ULMA Construction Formwork Collomix Mixers/Blenders Grouts & Grout Pumps Concrete Skips MODULO Formwork for Ventilated Foundations Form Release Concrete Remover Concrete Curing Compounds Concrete Surface Finishes Concrete Repair Concrete Sealants Waterstops / Waterproofers Flooring & Paving Systems Air Filtration & Dust Control Tapes Epoxies Abrasives Concrete Accessories
 

TRANSGUARD 4000 Reusable Curing Cover

click to enlarge


click to enlarge


  Click on the images to view enlargements.

Mt Eden Reservoir Reconstruction
Auckland, New Zealand

Main Contractor Brian Perry Civil

This contract required the replacement of the existing 3 tanks, within the existing footprint, that are 6 meters deep with the combined area of a rugby field. The tanks are between 80 and 100 years old and are the highest in the Auckland area.

Correct curing of the new structural concrete was deemed essential by the design team, so Transguard 4000 was chosen for its ability to hold a sheet of water in direct contact with the curing concrete and stop surface dehydration.

The Gibbons Contractors have found the blanket easy to work with and from the photos the difference between the exposed concrete and the covered concrete is obvious.

more information about the project on the www.brianperrycivil.co.nz website


Products used:
  • TRANSGUARD 4000