Home | Contact | News Concrete Formwork MODULO Formwork for Ventilated Foundations Form Release Concrete Remover Concrete Curing Compounds Concrete Surface Finishes Concrete Repair Concrete Sealants Waterstops / Waterproofers Grouts & Grout Pumps Flooring Systems Tapes Epoxies Abrasives Concrete Accessories


MATERIAL SAFETY DATA SHEETS

Re-usable Plastic Concrete Formwork

click to enlarge
More than 80 columns where poured using only 2 x 3m Geotubs - c/o Heb Structures
click to enlarge
You will notice the unsightly ring on the top of the column poured using an old steel mould for comparison
c/o Heb Structures

click to enlarge
Added advantage of being able to vary the height when needed - c/o Heb Structures
click to enlarge
You will notice the unsightly ring on the top of the column poured using an old steel mould for comparison
c/o Heb Structures

click to enlarge
More than 80 columns from only 2 x 3m Geotubs! - c/o Heb Structures
80 Round Columns.
Beaumonts Bridge,
Manurewa, Auckland.

Constructed by Heb Structures - Auckland

Products used:
  • 2 x 900mm round x 3m high.

Heb Structures bought two 3 metre round Geotub columns to pour 80 columns on this project.
The Geotub formwork will pay for itself on this contract and then be stored for the next one in ‘as new’ condition.
  • Quicker to set up and strip than the steel ones.
  • Added advantage of being able to vary the height when needed.
  • You will notice the unsightly ring on the top of the column poured using an old steel mould for comparison.
Great product. With it's segmental and clip design, erection by hand is quick and easy. Moulds can be adjusted to suit differeing column heights. Easily cleaned and stored ... thirty plus pours and they're still going strong.

Terry Shepperd - Project Manager
Heb Structures