Plumbed and ready for the next pour - c/o Canam Construction
Clean up with a rag and water - c/o Canam Construction
Cleaned and ready to go again - c/o Canam Construction
180 x 3m columns completed using only 6 column formers - c/o Canam Construction
180 x 3m columns completed using only 6 column formers - c/o Canam Construction
Cleaning is so quick and easy - c/o Canam Construction
Canam Construction site
Great South Road
Products used:
6 x 600 Square columns.
120 columns poured from 2250m to 8m tall.
John Crisp, Canam Construction Foreman used the 600mm Square Geotub Formwork on the Canam Construction site at Great South Road, Auckland.
“
By Far the quickest formwork system I have ever used ... the system is fast - over twice as good to set up as conventional formwork with no variations or twists. Geotub was light yet tough, easy to use and left a good finish. I would hate to go back to the old system.”