GEOTUB® reusable concrete formwork column formers are made from recyclable plastic, and need no special storage conditions. Manufacturers claim of up to 100 reuses means they are easily the smart option against steel, timber, or cardboard.
Lightweight and modular means they can be erected by one person and with no crane time required.
GEOTUB's smooth surface facilitates easy stripping and a provides a smooth clean concrete finish with a minimum of imperfections.
Everitt Site Supplies recommend 'Kleen Kote' protection and release formula to maintain your forms in top condition.
Robust
Reusable
Recyclable
Animated Presentation
Who's Saving Costs by Using Geotub Formwork?
GEOTUB formwork helps make quick work of round columns at The Strand, Takapuna
GEOTUB formwork helps make quick work of round columns at The Strand, Takapuna
The Strand, Takapuna
Constructed by B & W Construction
Products used:
6 X 600mm x 3m high Round Geotub
“
Absolutely brilliant. Best former I have ever used. Light, quick easy to erect
”
Ian White - Supervisor
B & W Construction
Click on the images to view enlargements.
See who else has used the revolutionary GEOTUB Formwork ... VIEW OTHER PROJECTS
Advantages of using GEOTUB Formwork
REUSABLE
GEOTUB® is cost-competitive as it can be used for an average of 100 pours. As concrete does not stick to plastic, cleaning of the formworks is done using just some water: the use of detergents and stripping agents is not necessary.
FAST SET-UP AND STRIPPING
Setting-up the formwork and stripping after pouring are easy and fast operations, thanks to the special handles that lock with a simple 90 degree turn.
MODULARITY
GEOTUB® is a modular element with a height of 60 cm: it does not need to be cut to length as only the amount of elements required for the pour is used.
STORAGE
GEOTUB® can be completely disassembled and does not need to be stored in a dry environment.
HANDLING ON SITE
Thanks to their small size and weight, the elements can be easily handled in the construction site, and can be easily assembled where required.
RESULTS
The surface of columns poured with GEOTUB® can be left in sight without any further rework.
SETTING-UP
The single elements are joined using high-strength nylon handles. The set-up operation is very fast as the fast-lock nylon handles firmly join the forms with a simple 90 degree turn. There is no particular direction to follow while assembling the GEOTUB® elements, nor when using the handles, as they are are universal.
Brochures & Spec Sheets
The following documents require the Adobe Viewer to be installed.
If you are experiencing problems viewing these PDFs, please click the icon on the right to first ensure you have the latest Adobe Reader installed. If you are still experiencing problems please email us, specifying the documents you require and we will email them to you.
GEOTUB catalogue (834kb) (17 seconds approx on an ADSL broadband connection)
Assembly Manual (922kb) (19 seconds approx on an ADSL broadband connection)